Grid Code

Rules prescribing the operation and management of the transmission system known as the Grid Code came into effect on 28th January 2014 when it was approved by the Board of Directors of EWURA. The application and legality of the Grid Code is provided for under Section 41(5)(a) and  Section 45(b)(v) of the Electricity Act  and rule 34 of the Electricity (Transmission Services) Rules, 2010

1. Grid Code Preamble

2. Network Code Tanzania

3. System Operation Code

4. Scheduling and Dispatch Code

5. Metering Code

6.Information Exchange Code

7. Transmission Tariff Code

8. Governance Code